FY17 A/E Schedule
Using This Site
Below is an explanation of the columns and their meaning.
A/E Category Description: The A/E category from which the requirement is being solicited.
Project Description: Brief project description.
TO Fair Opportunity: List of firms selected to compete for the TO and their associated subcontract POC.
Note: Firms 4 and 5 will be used if the Contracting Officer deems additional firms are necessary for a given requirement.
Solicitation Date: Date the RFQ was transmitted.
Response Due: Initial Due date for qualifications.
Note: If the response date (as amended) has passed, offerors will no longer be able to change the composition of their team.
Response Due as Amended: If the TO was amended and the due date for qualifications was changed, the updated date will be input.
Solicitation PDF: A PDF copy of the RFQ to include the scope of work.
For questions regarding this site, contact Jeralyn.Johnson@dc.gov.
Site Inclusions
A/E TOs will be posted once the solicitation has been sent to all offerors.
If a solicitation is amended to extend the response due date, the new date will be posted in the Response Due as Amended field.
Site Exclusions
TOs solicited under the Cooperative Purchasing clause will not be posted
Amendments will not be available for download
Forecasted TO requirements
Set asides as permitted by local law or regulation
Once a TO is awarded, it will be moved to the Task Order page on the left.
A/E Schedule Tool Box
- FAQ As of 19 November 2017 [PDF]
- Crossing the "Acceptable" Chasm [PDF]
- Category Award Matrix [PDF]
- 27 DCMR [PDF]
- Procurement Practices Reform Act [PDF]
- OCP Solicitation Website [Weblink]
- Contract Invoicing Information [DOC]
- Good to Great Series-CM RFQ Market Response Analysis Presentation Nov 2018 [PDF]
- Certification of Final Indirect Costs [PDF]
- Checklist for Indirect Costs Submission [PDF]
- Cost Summary Template [XLS]
- DSLBD District Connect 2019_Good to Great Refresh [PDF]
- OCP DDOT Procurement Manual [PDF]
A/E Category Description | Project Description | Task Order Fair Opportunity (At Least 3) |
|
| Response Due Amended | Solicitation PDF | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
Firm 1 | Firm 2 | Firm 3 | Firm 4 | Firm 5 | |||||||
1 | Cat K - Public Participation & Partnering | District TDM– | AECOM | Alta Planning + Design Carolyn Sullivan | Foursquare ITP Lora Byala | Kimley-Horn and Associates David Whyte david.whyte@kimley-horn.com | Parsons Stephen Walter stephen.c.walter@parsons.com |
|
| Download Here | |
2 | Cat U - Program Management | DC Circulator Program | Hill International, Inc. | Jacobs Engineering Group, Inc. Kenneth Shields | WSP, P.C. Marsha Kaiser | Rummel Klepper & Kahl, LLP | AECOM Services Sean Rousseau sean.rousseau@aecom.com | Download Here | |||
3 | OPTION YEAR 1 RFQS | ||||||||||
4 | Cat S Transit Consulting | DC Circulator Program Support Services | AECOM Sean Rousseau sean.rousseau@aecom.com | Kimley-Horn and Associates David Whyte | Scott Crumley Kahl | STV Lara Hegler lara.helger@stvinc.com |
| ||||
5 | Cat D- Construction Engineering and Management Services | Replacing damaged guiderails and impact attenuators CANCELLED | CES Consulting Avtar Singh asingh@ces-consultingllc.com | Jacobs Engineering Group Kenneth C. Shields, | KCI Associates of DC Mary Wiedorfer | EBA Rizwan Siddiqi rizwan.siddiqi@ebaengineering.com | Dewberry David Hieber dhieber@dewberry.com |
|
|
| |
7 | Cat D Construction Management Services | Rehab 16th Street Bridge over Piney Branch CANCELLED | Mugdha Pimprikar mpimprikar@sheladia.com | Temple Group Roland Barnes | WSP Donald MacLean | CANCELLED |
|
| |||
8 | Cat D Construction Management Services | Safe Routes ot School CM Service CANCELLED | formerlyAMEC) Jason Wits jason.wits@woodplc.com | Bree & Associates Robert Lancaster | CES Consulting Avtar Singh |
|
| ||||
9 | Cat I Transportation Planning Studies | I66/Rock Creek Parkway/K Street Interchange Study CANCELLED | ALtaPlanning+Design Sarah Thornton sarahthornton@altaplanning.com | HDR Philip Riggio | Veronica Davis vdavis@nspiregreen.com |
|
| ||||
10 | Cat F Traffic Engineering (Ops & Safety) | Traffic Safety and Engineering - Systemic Analysis | HDR Engineering Nancy Connor | Sam Schwartz Consulting Richard Retting | STV Incorporated Lara Hegler |
|
| ||||
11 | Cat K - Public Participation & Partnering | Circulator Program Marketing Outreach and Customer Service CANCELLED | Veronica Davis | PRR, Inc. Tracee Strum-Gilliam | AECOM Sean Rousseau (Withdrew) |
|
| ||||
12 | OPTION YEAR 2 RFQS | ||||||||||
13 | Cat R Stormwater Management and Green Infrastructure Design | Cleveland Park Drainage and Watershed Improvements - CANCELLED | AECOM Sean Rousseau | Whitman, Requardt & Associates Joe Makar | Volkert Engineering, PC Ben Lineberry |
|
|
| |||
14 | Category L – Bicycle and Pedestrian Studies, Planning and Design | Near NW III Livabilty Study | Kittelson& Associates Adam Vest | Sabra & Associates, Inc. Ziad Sabra (withdrew) | Toole Design Melany Alliston-Brick | Kimley-Horn and Associates David Whyte (added) (withdrew) |
|
|
| ||
15 | Cat A Roadway Design | K Street Transitway Final Design | A. Morton Thomas, Inc. Richard Higdon | Johnson, Mirmiran & Thompson, Inc. Jay Smith | Precision Systems, Inc. Steven Houh | Vanasse Hangen Brustlin, Inc. Jen McGovern | WSP Rolando Amaya |
|
|
| |
16 | Cat N Pavement Management and Infrastructure Data Collection | FY18 Traffic Sign Inventory and Upgrade CANCELLED | AECOM Sean Rousseau (withdrew) | Wood PLC (formerly Amec Foster) Jason Wits (withdrew) | Applied Research Associates Jacob Walter (withdrew) | O'Connell & Lawrence Carrie Foster (withdrew) | Precision Systems, Inc. Steven Houh |
|
|
| |
21 | Category L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | Alta Planning+Design Jennifer Baldwin jennifer.baldwin@altaplanning.com (withdrew) | Kimley-Horn David Whyte (withdrew) | Kittelson Bailey Lozner (withdrew) | Vanasse Hangen Brustlin, Inc Mark Colgan (added) | Stantec Bimal Patel (added) |
|
| ||
25 | Cat A - Roadway Design | Citywide sign structure -upgrade & replacement. Final Design and PS&E package | A. Morton Thomas and Associates, Inc. Laura Mehiel | Gannett Fleming Eng. & Architects Steven Hawtof (withdrew) | AECOM Sean Rousseau (withdrew) | Dewberry Kurt Thompson (added) (withdrew) | Delon Hampton & Associates, Chartered Mamo Assefa (added) |
| |||
26 | Cat A - Roadway Design | I -295 Weight Station Upgrade | Century Engineering, Inc. Ken Stratemeyer | Alpha Corporation Elizabeth Blevins Elizabeth.blevins@alphacorporation.com (withdrew) | Sheladia Assocaites, Inc. Mugdha Pimprikar | WSP Rolando Amaya |
|
| |||
28 | Category J – Transportation Research and Technology Transfer | Roadmap for Agency-wide approach to Automated Image Processing | Manuch Amir CDM Smith Inc. (withdrew) | Manzur Elahi Daniel Consultants, Inc. (withdrew) | Steven Houh Precision Systems, Inc. (withdrew) | Mugdha Tipnis | Kittelson& Associates Adam Vest Toole Design Melany Alliston-Brick |
|
| ||
33 | Cat D Construction Management and Inspection Services | Upgrade and Repair to Weigh-in-motion (WIM) | Cube Root Daniel Davies | Temple Group Roland Barnes | Parsons Ronaldo Nicholson | Download Here | |||||
37 | Category D – Construction Engineering and Management Services | Florida Ave and NY Ave NE Intersection | Volkert Adil Rizvi Adil.rizvi@volkert.com | Whitman Requardt and Associates James Guinther jguinther@wrallp.com | AECOM Sean Rousseau (withdrew) | Download Here | |||||
39 | Category L – Bicycle and Pedestrian Studies, Planning and Design | Permanent Curb Extension Study | Kimley-Horn David Whyte | Kittelson Asociates Alek Pochowski | RK&K Scott Crumley | ||||||
40 | Cat N Pavement Management and Infrastructure Data Collection Services | Traffic Sign Inventory Upgrade | AECOM Sean Rousseau (withdrew) | RAMS Mesfin Lakew (withdrew) | VHB James Long (withdrew) | Applied Research Maxx Leach (added) | O'Connell & Lawrence Carrie Foster (withdrew) PSI Steven Houh (added) | ||||
41 | Cat A Roadway Design | Georgetown Transportation Access and Circulator Study | Pennoni Ted F. Januska (withdrew) | Brudis Billy Brudis bbrudis@brudis.com | CV, Inc. Chinmay Vyas cvyas@cvinc.com | Mead Hunt (formerly Sabra & associates) Ziad Sabra ziad.zabra@meadhunt.com | STV Alfonso Ronca Alfonso.ronca@stvinc.com | ||||
42 | Cat G Geotechnical Investigations and Studies | Subsurface | Subsurface Pavement & Geotechnical Engineering | Soil and Land Use Technology (SALUT) Imran M. Syed isyed@salutinc.com | HDR Engineering Thomas Perry Thomas.Perry@hdrinc.com | EBA Engineering Pranoy Choudhury Pranoy.choudhury@ebaengineering.com (withdrew) | The Balter Company Edward Balter ebalter@balterco.com |