FY17 A/E Schedule Task Orders
Preliminary Notification Board
Category of A/E Service | Project Description | Firm Determined MHQ |
---|---|---|
Cat D CM Services | 16th Street Bridge over Piney Branch- CANCELLED | WSP |
Cat K – Public Participation & Partnering | Circulator Program Marketing, Outreach and Customer Service CANCELLED | NspiregreenLLC |
Cat R Stormwater Management and Green Infrastructure Design | Cleveland Park Drainage and Watershed Improvements - CANCELLED | Volkert Engineering, PC |
Cat N Pavement Management and Infrastructure Data Collection | Traffic Signal Inventory CANCELLED | PSI |
Cat D Construction Management Services | Cleveland Park Streetscape and Drainage | PRIME AE Group |
Cat R Stormwater Management and Green Infrastructure Design | Broad Branch Stormwater Retrofit Project | Rummel, Klepper & Kahl, LLP (RK&K) |
Cat D Construction Management Services | Upgrade and Repairs to Weigh-in-Motion | Parsons Transportation Group |
Cat A Roadway Design | Georgetown Transportation Access and Circulation Study | MeadHunt |
Cat L Bicycle & Pedestrian Studies, Planning & Design | Permanent Curb Extension Study | Kitteslon & Associates |
Cat A - Roadway Design | I-295 Weigh Station | WSP |
A/E IDIQ Award Statistics (Final)
A/E Awards
A/E Category Description | Project Description | Number of Firms Solicited | Date Solicitation was Transmitted | Date TO Award was Made | Successful Offeror Name | Published Award Document | |
---|---|---|---|---|---|---|---|
1 | Cat D Construction Engineering and Management Services | Construction of Fiber Optic Networks along Freeways | 3 | Whitman Requart and Associates | Award Document | ||
2 | Cat D Construction Engineering and Management Services | Reconstruction of Hill East Water Front Phase 1 | 3 | Alpha Corporation | Award Document | ||
3 | Cat C Bridge Design | City Wide on call Bridge Design Services | 3 |
| Pennoni Corporation | Award Document | |
4 | Cat D Construction Engineering and Management Services | Rehabilitation of Anacostia Freeway Bridges (Nos. 1016 &1017) over South Capitol Street Construction Project RR | 3 |
| CES Consulting, LLC | Award Document | |
5 | Cat O Right of WAY | Assistance in Acquisition of Lots 804 and 812 in Square 810 | 3 |
| Rummel Klepper and Kahl | Award Document | |
6 | Cat A Roadway Design | Pennsylvania Ave NW Streetscape | 3 |
| Vanasse Hangen Brustlin | Award Document | |
7 | Cat O Right of Way | Lot 5 Square 709 Florida Ave Multi Modal Transportation Project Lot 5 Square | 3 |
| Johnson Mirmiran & Thompson | Award Document | |
8 | Cat L-Bicycle and Pedestrian Studies | Palisades Trolley and Foundry Feasibility Study and concept Plan project PPP | 3 |
| Kittelson and Associates | Award Document | |
9 | Cat E- Traffic Engineering (Streetlight and Traffic Signal Design) | Traffic Signal Design Consultant Tra | 5 |
| Sabra Wang Associates Rummel Klepper and Kahl | ||
10 | Cat I Transportation Planning Studies | Parkside Access and Circulation Study Par | 3 3 |
| Parsons Transportation Group | Award Document | |
11 | Cat F Traffic Engineering (Safety and Operations) | Traffic Signal Systems Analysis | 5 |
|
| Johnson Mirmiran & Thompson Volkert Engineering | |
12 | Cat I Transportation Planning Studies | Rock Creek East 1 Livability Study Project | 3 |
| Rummel Klepper Kahl | Award Document | |
13 | Cat I Transportation Planning Studies | Rock Creek Far West Livability Study | 3 |
| Nspiregreen LLC | Award Document | |
14 | Cat U Program Management | Regional, Multimodal Curbside Asset Management Services RFP Preparation Support | 3 |
|
| AECOM | Award Document |
15 | Cat D Construction Management Services | Rehabilitation of East Capitol Street Bridge over Anacostia River | 3 |
|
| Rummel Klepper and Kahl | Award Document |
16 | Cat D Construction Management Services | 31st Street Bridge over C&O Canal | 5 |
| Volkert Engineering | Award Document | |
17 | Cat A Roadway Design | Design Services for Aspen Street NW project | 3 |
| Precision Systems, Inc. | Award Document | |
18 | Cat D Construction Management Services | Installation of CCTV on major arterials in the District | 3 |
| Prime AE Group | Award Document | |
19 | Cat P ITS Services | FY 18 ITS on-call support services | 3 |
| M&J Engineering | Award Document | |
20 | Cat O Right of Way | Acquisition, appraisal, relocation, environmental assessment and hazmat survey in Lot 10, Lot 84 and Lot 819 | 4 |
| Rummel, Klepper and Kahl | Award Document | |
21 | Cat P ITS Services | System Design Upgrade and Repair to Weigh-in-Motion (WIM) | 3 |
| HDR Engineering | Award Document | |
22 | Cat D Construction Management Services | Rehabilitation of New Jersey Ave NW from H Street to M Street | 5 |
| Somat Engineering | Award Document | |
23 | Cat J Transportation Research and Technology Transfer | Highway Safety Administrative Support | 5 |
| KLS Engineering | Award Document | |
24 | Cat C Bridge Design | Open-end Engineering Services for Bridges and Structures | 3 |
| WSP P.C. | Award Document | |
25 | Cat N Roadway Pavement Marking Assessment | FY 18 Roadway Pavement Marking Assessment | 5 |
| Applied Research | Award Document | |
26 | Cat D Construction Management Services | Maryland Ave from 2nd Street to 14th Street NE | 3 |
| Cube Root Corporation | Award Document | |
27 | Cat I Transportation Planning Studies | Capital Bikeshare Development Plan Update | 3 |
| Kittelson & Associates | Award Document | |
28 | Cat A Roadway Design | 30-100% Design of Florida Ave from 2nd Street NE to H Street NE and Florida Ave and New York Ave NE Intersection | 3 |
| Johnson Mirmiran & Thompson | Award Document | |
29 | Cat D Construction Engineering and Management Services | Construction Management, Inspections and Engineering Services during construction for the DC PLUG Feeder 308 Construction Project | 8 |
| Kumi Construction Management | Award Document | |
30 | Cat D Construction Engineering and Management Services | Blair Road/Cedar Street/4th Street NW Intersection Improvement project | 3 |
| Parsons Transportation Group | Award Document | |
31 | Cat A Roadway Design | Hydraulic Structures Design Improvements | 3 |
| Wallace Montgomery | Award Document | |
32 | Cat D Construction Engineering and Management Services | Streetlight Upgrade of the Metropolitan Branch Trail between FLorida Ave and Franklin Street | 3 |
| EBA Engineering | Award Document | |
33 | Cat L Bicycle and Pedestrian Studies, Planning & Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | 3 |
| Vanasse Hangen Brustlin | Award Document | |
34 | Cat D Construction Engineering and Management Services | Oregon Avenue NW from Military Road to Western Ave and Western Ave from Oregon to 31st St | 3 |
| AECOM | Award Document | |
35 | Cat D Construction Engineering and Management Services | I-395 Sign Structure Improvement | 3 |
| RKK | Award Document | |
36 | Cat F Traffic Engineering (Operations and Safety) | Traffic Signal On-Site Support Services | 3 |
| Kimley-Horn | Award Document | |
37 | Cat A Roadway Design | S Street Revitalization from 7th Street to Florida Ave | 3 |
| A Morton Thomas | Award Document | |
38 | Cat U Program Management | Regional, Multimodal Payment & Data Aggregator/Mobility Wallet Services RFP Preparation Support | 6 |
| AECOM | Award Document | |
39 | Cat A Roadway Design | Pennsylvania & Potomac Avenue Intersection Improvements | 3 |
| Brudis & Associates | Award Document | |
40 | Cat A Roadway Design | Construction Cost Estimate review | 5 |
| Whitman Requardt and Associates, LLP | Award Document | |
41 | Cat A Roadway Design | Chestnut Street Sidewalk Improvement Project | 3 |
| Louis Berger DC LLC | Award Document | |
42 | Cat F Traffic Engineering (Ops & Safety) | Connecticut Avenue NW Reversible Lane Safety and Operations Study | 3 |
| A Morton Thomas | Award Document | |
43 | Cat D Construction Engineering and Management Services | Parkside Pedestrian Bridge | 3 |
| TY Lin International | Award Document | |
44 | Cat A Roadway Design | East Capitol Street Mobility and Safety Plan | 3 |
| AECOM | Award Document | |
45 | Cat Q Construction Materials Testing | Construction Materials Testing for City Wide Projects | 2 |
| EBA Engineering | Award Document | |
46 | Cat D Construction engineering and Management Services | Rehab. of MLK Jr. Ave | 3 |
| Quinn Consulting | Award Document | |
47 | Cat A Roadway Design | 30-100% design of Metropolitan Branch Trail from Fort Totten to Takoma NW | 3 |
| Stantec Consulting Services | Award Document | |
48 | Cat I Transportation Planning Studies | Safe Routes to School Planning Assistance | 3 |
| Nelson/Nygaard | Award Document | |
49 | Cat C Bridge Design | Rehab of Anacostia Bridges No. 78 and 47 | 3 |
| Pennoni | Award Document | |
50 | Cat F – Traffic Engineering (Ops & Safety) | Traffic Safety and Engineering - Systemic Analysis | 3 |
| Sam Schwartz Consulting, LLC | Award Document | |
51 | Cat C Bridge Design | Appproach Bridges to 14th Street SW (Bridges Nos. 171-1,171-2,171-3,021,1134 and 1134A-1) Phase 2 | 3 |
| HNTB District of Columbia, P.C. | ||
52 | Cat S Transit Consulting Technical Services | Bus Priority Plan and Program | 3 |
| HNTB District of Columbia, P.C. | Award Document | |
53 | Cat P Intelligent Systems | Network Consolidation Management | 3 |
| Daniel Consultant | Award Document | |
54 | Cat I Transportation Planning Studies | Move DC | 3 |
| RKK | Award Document | |
55 | Cat D Construction Management Services | Guiderails and Impact Attenuators (9 months) | 3 |
| Sheladia | Award Document | |
56 | Cat R Stormwater | 4 Watershed Designs | 3 |
| Arcadis | Award Document | |
57 | Cat F – Traffic Engineering (Ops & Safety) | Traffic Operations and Parking Plan | 3 |
| Century Engineering, Inc. | Award Document | |
58 | Cat D Cat D Construction engineering and Management Services | Mass Ave. NW Rehabilitation Project from 20th Street to Waterside Drive | 5 |
| HNTB DC | Award Document | |
59 | Cat A Roadway Design | Stormwater Design | 3 |
| Sabra and Associates | Award Document | |
60 | Cat D – Construction Engineering & Management Services | Inspection Services for the Biennial Culvert Inspection Program | 3 |
| KCI Associates of DC, PC | Award Document | |
61 | Cat A Roadway Design | Canal Rockslope Stabilization | 3 |
| Gannett Fleming | Award Documentt | |
62 | Category R – Stormwater Management and Green Infrastructure Design | Stormwater Retorfit | 3 |
| Straughan Environmental | Award Document | |
63 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | 15th Street Bicycle Safety Improvements Design | 3 |
| Nelson/Nygaard Consulting Associates, Inc. | Award Document | |
64 | Cat F -Traffic Engineering (Ops & Safety) | Highway Safety Improvement Program | 3 |
| VHB | Award Document | |
65 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Near Northwest III Livability Study | 3 |
| Kittelson & Associates | Award Document | |
66 | Cat D – Construction Engineering & Management Services | Rock Creek Trail CM Services | 5 |
| HNTB | Award Document | |
67 | Cat D – Construction Engineering & Management Services | 16th Street Bus Lanes | 3 |
| Parsons | Award Document | |
68 | Cat D – Construction Engineering & Management Services | Safety and Geometric Improvements of I-295 | 3 |
| STV | Award Document | |
69 | Cat J Transportation Research & Technology | Pedestrian and Cyclist Intersection Safety Sandbox | 3 |
| HNTB | Award Document | |
70 | Cat P Intelligent Transportation System | ITS General Support | 3 |
| ITERIS | Award Document | |
71 | Cat D Construction Engineering and Management Services | Penn Ave SL Upgrade | 3 |
| M&J Engineering | Award Document | |
72 | Cat D Construction Engineering and Management Services | C Street Implementation | 3 |
| Jacobs | Award Document | |
73 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Garfield Park-Canal Park Connector Design | 3 |
| RK&K | Award Document | |
74 | Cat A Roadway Design | South Capitol Street Circulator Facility | 3 |
| Jacobs | Award Document | |
75 | Cat A Roadway Design | Van Ness Corridor Design | 3 |
|
| Wallace Montgomery | Award Document |
76 | Cat A - Roadway Design | K Street Transitway Final Design | 5 |
| Johnson, Mirmiran, & Thompson, Inc. | Award Document | |
77 | Cat D Construction Management | Florida Ave 9th to Sherman | 3 |
| RKK | Award Document | |
78 | Cat D Construction Management | Service Sign Installation Backlog | 3 |
| CKI | ||
79 | Cat I Transportation and Planning Studies | DC Circulator Feasibility | 3 |
| WSP | ||
80 | Cat A Roadway Design | Cleveland Park Drainage Improvements | 3 |
| Parsons | Award Document | |
81 | Cat D Construction Management | Chestnut Sidewalk CM | 3 |
| CES Consulting | Award Document | |
82 | Cat D Construction Management | Southern Avenue | 3 |
| RAMS Engineering | Award Document | |
83 | Cat P Intelligent Transportation Systems | Traffic Center Management Relocation Feasibility | 3 |
| PSI | Award Document | |
84 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Metropolitan Branch Trail | 3 |
| Fehr and Peers | Award Document | |
85 | Cat D Construction Management Services | Construction Inspection Services for St. Elizabeths East Campus Stage 2 | 3 |
| Dewberry | Award Document | |
86 | Cat C Bridge Design | CW Structures and Bridge Design | 3 |
| WSP | Award Document | |
87 | Cat D Construction Management Services | Drainage and Stormwater Improvements | 3 |
| Alpha Corporation | Award Document | |
88 | Cat D Construction Management Services | Kenilworth Courts | 3 |
| KCI | Award Document | |
89 | Cat N Pavement Management and Infrastructure Data Collection Services | FY21 Road Assessment | 3 |
| PSI | Award Document | |
90 | Cat A - Roadway Design | Macomb Street NW Reconstruction | 3 |
| HNTB | Award Document | |
91 | Cat D Construction Management Services | Douglas Pedestrian Bridge | 3 |
| HNTB | Award Document | |
92 | Cat L Bicycle and Pedestrian Studies Planning and Design | Vision Zero Safety Conceptual Design Support | 3 |
| Kittelson | Award Document | |
93 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Bladensburg Road Multimodal Study and access | 3 |
| KLS | ||
94 | Cat I Transportation & Planning Studies | MLK Jr-Good Hope Road SE Safety and Connectivity Study | 3 |
| Kittelson | ||
95 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | 3 |
| VHB | Award Document | |
96 | Cat C Bridge Design | I-66 Ramp to Whitehurst Frwy and K Street NW Bridge over Whitehurst Freeway Ramp | 3 |
| RKK | Award Document | |
97 | Cat D Construction Management Services | Rehab of 16th Street Bridge over Piney Branch | 3 |
| Bree & Associates | Award Document | |
98 | Cat A Roadway Design | Tenleytown Multimodal Access Project | 3 |
| STV | Award Document | |
99 | Cat D Construction Management Services | Florida Ave Ne 2nd St Ne to 14th Street NE | 3 |
| Somat Engineering | Award Document | |
100 | Cat A Roadway Design | Alabama Avenue MLK to Bowen | 3 |
| Volkert Engineering | Award Document | |
101 | Cat C Bridge Design | New York Avenue Bridge over Anacostia Preliminary and Final Design | 3 | TY Lin | Award Document | ||
101 | Cat D Construction Management Services | Hot Thermoplastic Paving Marking | 3 | EBA | Award Document | ||
102 | Cat C Bridge Design | Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2 | 3 | HDR | Award Document | ||
103 | Cat D Construction Management Services | Fiber Conduit Inspection and Cleaning | 3 |
| CES Consulting | Award Document | |
104 | Cat H Environmental Engineering Investigation | New York Avenue Trail | 3 | CH2M Hill | Award Document | ||
105 | Cat N Pavement Management and Infrastructure Data Collection | Mobile Pavement Marking and Data Collection | 3 | PSI | Award Document | ||
107 | Cat I Transportation and Planning Studies | Positive Truck Route Signage | 3 | WSP | Award Document | ||
108 | Cat A Roadway Design | North Capitol Street Corridor | 3 | KLS | Award Document | ||
109 | Cat L Bicycle and Pedestrian Studies, Planning & Design | Suitland Parkway Concept Engineering | 3 | VHB | |||
110 | Cat C Bridge Design | Anacostia Metro Ped Bridge | 3 | WSP | Award Document | ||
111 | Cat N Pavement Management and Infrastructure Data Collection | FY 22 Sidewalk Condition Assessment | 3 | O'Connell & Lawrence | Award Document | ||
112 | Cat A Roadway Design | Stormwater/Hydaulics Stormwater Drainage Design | 3 | Stantec | Award Document | ||
113 | Cat H Environmental Engineering Investigation and Studie | Arizona Avenue Connection to the Capital Crescent Trail | 3 | Stantec | Award Document |