Architect and Engineering Task Order Home



Welcome to our new space for A/E Task Order Solicitations

The purpose of this site is to publicize solicitations for Architect & Engineering ("A/E") Task Orders ("TO") and to communicate other information relevant to those who are participating and/or teaming on the A/E schedule.


Using This Site

Below is an explanation of the columns and their meaning.

  • A/E Category Description: The A/E category from which the requirement is being solicited.
  • Project Description: Brief project description.
  • TO Fair Opportunity: List of firms selected to compete for the TO and their associated subcontract POC.

Note: Firms 4 and 5 will be used if the Contracting Officer deems additional firms are necessary for a given requirement.

  • Solicitation Date: Date the RFQ was transmitted.
  • Response Due: Initial Due date for qualifications.

Note: If the response date (as amended) has passed,offerors will no longer be able to change the composition of their team.

  • Response Due as Amended: If the TO was amended and the due date for qualifications was changed, the updated date will be input.
  • Solicitation PDF: A PDF copy of the RFQ to include the scope of work.

For questions regarding this site, contact Jeralyn.Johnson@dc.gov.

Site Inclusions

  • A/E TOs will be posted once the solicitation has been sent to all offerors.
  • If a solicitation is amended to extend the response due date, the new date will be posted in the Response Due as Amended field.

    Site Exclusions

  • TOs solicited under the Cooperative Purchasing clause will not be posted
  • Amendments will not be available for download 
  • Forecasted TO requirements
  • Set asides as permitted by local law or regulation


Once a TO is awarded, it will be moved to the Task Order page on the left. 







A/E Category Description

Project Description
Task Order Fair Opportunity (At Least 3)
Solicitation Date


Response Due


Response Due
Amended


Solicitation PDF

Firm 1
Firm 2
Firm 3
Firm 4
Firm 5
1Cat K - Public Participation & Partnering District TDM–

 AECOM
Sean M. Rousseau
sean.rousseau@aecom.com

Alta Planning + Design
Carolyn Sullivan
carolynsullivan@altaplanning.com

 Foursquare ITP
Lora Byala
lbyala@foursquare.com
Kimley-Horn and Associates
David Whyte
david.whyte@kimley-horn.com 
Parsons
Stephen Walter
stephen.c.walter@parsons.com

 

   


 Download Here
2Cat U - Program ManagementDC Circulator Program

Hill International, Inc.
Edward Newman
edward.newman@hillintl.com

Jacobs Engineering Group, Inc.
Kenneth Shields
kenneth.shields@jacobs.com

WSP, P.C.
Marsha Kaiser
marsha.kaiser@wsp.com 

Rummel Klepper & Kahl, LLP
Scott Crumley
scrumley@rkk.com

AECOM Services
Sean Rousseau
sean.rousseau@aecom.com







Download Here
3

 OPTION YEAR 1 RFQS







4Cat S Transit ConsultingDC Circulator Program Support ServicesAECOM
Sean Rousseau
sean.rousseau@aecom.com
Kimley-Horn and Associates
David Whyte
david.whyte@kimley-horn.com 
Scott Crumley
Kahl
scrumley@rkk.com
STV
Lara Hegler
lara.helger@stvinc.com


 



 


Download Here

Download Here (Am. 1)

Download Here (Am. 2)

5

Cat D-

Construction Engineering and Management Services

Replacing damaged guiderails and impact attenuators

CANCELLED

CES Consulting
Avtar Singh
asingh@ces-consultingllc.com
Jacobs Engineering Group
Kenneth C. Shields,
kenneth.shields@jacobs.com
KCI Associates of DC
Mary Wiedorfer
mary.wiedorfer@kci.com
EBA
Rizwan Siddiqi
rizwan.siddiqi@ebaengineering.com
Dewberry
David Hieber
dhieber@dewberry.com

 

 

 

 

Download Here

Download Here

Download Here

6Cat C Bridge DesignPreliminary and Final Design of New York Ave Bridge over AnacostiaGannett Flemin Eng. & Architects
Steven Hawtof
shawtof@GFNET.com
HDR Engineering
Philip Riggio
philip.riggio@hdrinc.com
Dewberry
Kurt Thompson
kthompson@dewberry.com
Louis Berger DC LLC
Edward Chamberlayne
Echamberlayne@louisberger.com
TY Lin

inmar.badwan@tylin.com

 

 


Download Here

Amend 1

Amend 1

Amend 1

7Cat D Construction Management Services

Rehab 16th Street Bridge over Piney Branch

CANCELLED


Mugdha Pimprikar
mpimprikar@sheladia.com
Temple Group
Roland Barnes
rbarnes@thetemplegroup.com
WSP
Donald MacLean
donald.maclean@wsp.com
CANCELLED

 

 


Download Here

Download Here

8Cat D Construction Management Services

Safe Routes ot School CM Service

CANCELLED

formerlyAMEC)
Jason Wits
jason.wits@woodplc.com
Bree & Associates
Robert Lancaster
robl@breeassociates.com
CES Consulting
Avtar Singh
asingh@ces-consultingllc.com


 

 


9Cat I Transportation Planning Studies

I66/Rock Creek Parkway/K Street Interchange Study CANCELLED




ALtaPlanning+Design
Sarah Thornton
sarahthornton@altaplanning.com
HDR
Philip Riggio
philipriggio@hdrinc.com

Veronica Davis
vdavis@nspiregreen.com


 

 


10Cat F Traffic Engineering (Ops & Safety)Traffic Safety and Engineering - Systemic Analysis

HDR Engineering

Nancy Connor

Nancy.Connor@hdrinc.com

(Withdrew)

Sam Schwartz Consulting

Richard Retting

rretting@samschwartz.com

STV Incorporated

Lara Hegler

Lara.Hegler@stvinc.com



 

 

Download Here

Amendment 1


11Cat K - Public Participation & Partnering

Circulator Program Marketing Outreach and Customer Service

CANCELLED


Veronica Davis

vdavis@nspiregreen.com

PRR, Inc.

Tracee Strum-Gilliam

tstrum-gilliam@prrbiz.com

AECOM

Sean Rousseau

sean.rousseau@aecom.com

(Withdrew)



 

 


Download Here

Amendment 1

12










13


OPTION YEAR 2 RFQS






14Cat R Stormwater Management and Green Infrastructure DesignCleveland Park Drainage and Watershed Improvements - CANCELLED

AECOM

Sean Rousseau

sean.rousseau@aecom.com

Whitman, Requardt & Associates

Joe Makar

jmakar@wrallp.com

Volkert Engineering, PC

Ben Lineberry

Ben.Lineberry@volkert.com




 

 

 


Download Here

Amendment 1

Amendment 2

15Category L – Bicycle and Pedestrian Studies, Planning and DesignNear NW III Livabilty Study

Kittelson& Associates

Adam Vest

avest@kittelson.com


Sabra & Associates, Inc.

Ziad Sabra

zsabra@sabra-associates.com

(withdrew)

Toole Design

Melany Alliston-Brick 

malliston@tooledesign.com

Kimley-Horn and Associates

David Whyte

david.whyte@kimley-horn.com 

(added) (withdrew)


 

 

 

Amendment 1

Download Here
16Cat A Roadway DesignK Street Transitway Final Design

A. Morton Thomas, Inc.

Richard Higdon

rhigdon@amtengineering.com

Johnson, Mirmiran & Thompson, Inc.

Jay Smith

JSmith@jmt.com

Precision Systems, Inc.

Steven Houh

steven@dcpsi.com

Vanasse Hangen Brustlin, Inc.

JenMcGovern

JMcGovern@VHB.com

WSP

Rolando Amaya

Rolando.Amaya@wsp.com

 

 

 

Download Here

Amendment 1

Amendment 2

Amendment 3

17Cat N Pavement Management and Infrastructure Data Collection

FY18 Traffic Sign Inventory and Upgrade

CANCELLED

AECOM

Sean Rousseau

sean.rousseau@aecom.com

(withdrew)

Wood PLC (formerly Amec Foster)

Jason Wits

jason.wits@woodplc.com

(withdrew)

Applied Research Associates

Jacob Walter

jwalter@ara.com

(withdrew)

O'Connell & Lawrence

Carrie Foster

carrie.foster@oclinc.com

(withdrew)

Precision Systems, Inc.

Steven Houh

steven@dcpsi.com

 

 

 

Download Here

Amendment 1

Amendment 1 signed

18Cat A Roadway Design

Cleveland Park Drainage Improvements

Delon Hampton & Associates, Chartered

Mamo Assefa

massefa@delonhampton.com>

Parsons
Stephen Walter
stephen.c.walter@parsons.com
TY Lin
Inmar Badwan
inmar.badwan@tylin.com


 

 


Download Here
19Cat D Construction Engineering and Management ServicesThermoplastic Pavement Marking Stop Gap

J-Dos International

Janice Vieira

vieira@jdosinternational.com

Greenman Pedersen

KelleNeedle

kneedle@gpinet.com

(withdrew)

EBA Engineering

Kevin Kreis

kevin.kreis@ebaengineering.com



 

 


Download Here

Amendment 1

20Cat H Environmental Engineering Investigation and StudiesNew York Avenue Streetscape and Trail 

Kimley-Horn

David Whyte

david.whyte@kimley-horn.com

Whitman Requardt and Associates

James Guinter

jguinter@wrallp.com

(withdrew)

Stantec

Simon Simon

simon.simon@stantec.com

CH2MHill

Muhammed Khalid

muhammed.khalid@jacobs.com

HDR Engineering

Kim Myers

kim.myers@hdrinc.com

(withdrew)

 

 

  

Download Here

Amendment 1

Amendment 2


21

Cat A

Roadway Design

Alabama Avenue-Martin Luther King Jr, Ave to Bowen Concept/30% Design

Alpha Corporation

Elizabeth Blevins

Elizabeth.blevins@alphacorporation.com

Volkert

Laura Newberry

laura.newberry@volkert.com

Sheladia

Mugdha Pimprikar
mpimprikar@sheladia.com



 

 


Download Here

Amendment 1

22Cat A - Roadway DesignMacomb Street NW Reconstruction

HNTB, DC

Jon Whitney

jwhitney@hntb.com

KLS Engineering

Leverson Boodlal

leverson.boodlal@kls-eng.com

(Withdrew)

Toole Design 

Melany Alliston-Brick

malliston@tooledesign.com



 

 


Download Here
23Cat D Construction Management ServicesFlorida Ave Ne 2nd St Ne to 14th Street NE

Sabra & Associates(now Mead Hunt)

Ziad Sabra

Ziad.sabra@meadhunt.com


Somat Engineering

Arpan Patel

Arpan@somateng.com

Volkert

Laura Newberry

laura.newberry@volkert.com



 

 


Download Here

Amendment 1

Amendment 2

Amendment 3

24Category L – Bicycle and Pedestrian Studies, Planning and DesignBicycle and Pedestrian Facilities Design and Traffic Analysis

Alta Planning+Design

Jennifer Baldwin

jennifer.baldwin@altaplanning.com

(withdrew)

Kimley-Horn

David Whyte

david.whyte@kimley-horn.com

(withdrew)

Kittelson

Bailey Lozner

blozner@kittelson.com

(withdrew)

Vanasse Hangen Brustlin, Inc

Mark Colgan

mcolgan@vhb.com

(added)

Stantec

Bimal Patel

bimal.patel@stantec.com

(added)

 

 






Download Here

Amendment 1

Amendment 2


25Cat R –  Stormwater Management and Green Infrastructure DesignBroad Branch Stormwater Retrofit Project

Volkert Engineering, PC

Ben Lineberry

Ben.Lineberry@volkert.com

A. Morton Thomas and Associates, Inc.

Laura Mehiel 

lmehiel@amtengineering.com

RK&K, LLP

Scott Crumley 

scrumley@rkk.com




 

 


Download Here

Amendment 1

Amendment 2

Amendment 3

Amendment 4

Amendment 5

Amendment 6

26Cat C  – Bridge DesignSouthwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2

HDR Engineering

Thomas Perry

Thomas.Perry@hdrinc.com

CH2MHill

Muhammed Khalid

muhammed.khalid@jacobs.com

Hardesty and Hanover   

Rodney Jarrett     

rjarrett@hardestyhanover.com



 

 


Download Here

Amendment 1

27Cat D Construction Management ServicesFiber Conduit Inspection and Cleaning

Greenman-Pedersen

Kellee Needle

kneedle@gpinet.com

(withdrew)

CES

Syed Khan

srkhan@ces-consultingllc.com

M&J Engineering

Robert Carlson

rcarlson@mjengineering.com



 

 


Download Here

Amendment 1

28Cat A - Roadway Design

Citywide sign structure -upgrade & replacement.

Final Design and PS&E package  

A. Morton Thomas and Associates, Inc.

Laura Mehiel 

lmehiel@amtengineering.com

Gannett Fleming Eng. & Architects

Steven Hawtof

shawtof@GFNET.com

(withdrew)

AECOM

Sean Rousseau

sean.rousseau@aecom.com

(withdrew)

Dewberry

Kurt Thompson

kthompson@dewberry.com

(added)

(withdrew)

Delon Hampton & Associates, Chartered

Mamo Assefa

massefa@delonhampton.com

(added)

 


Download Here

Amendment 1

Amendment 2

29Cat A - Roadway DesignI -295 Weight Station Upgrade

Century Engineering, Inc.

Ken Stratemeyer

kstratemeyer@centuryeng.com

Alpha Corporation

Elizabeth Blevins

Elizabeth.blevins@alphacorporation.com

(withdrew)

Sheladia Assocaites, Inc.

Mugdha Pimprikar

mpimprikar@sheladia.com

WSP

Rolando Amaya

rolando.amaya@wsp.com


 

 


Download Here

Amendment 1

30Cat C Bridge DesignAnacostia Metro Pedestrian Bridge

Gannett Fleming

StevenHawtof

shawtof@GFNET.com

WSP

Rolando Amaya

rolando.amaya@wsp.com

Michael Baker

Kenneth Mobley

kmobley@mbakerintl.com



 

 


Download Here
31Category J – Transportation Research and Technology TransferRoadmap for Agency-wide approach to Automated Image Processing

Manuch Amir 

CDM Smith Inc.

AmirM@cdmsmith.com 

(withdrew)

Manzur Elahi

Daniel Consultants, Inc.

melahi@dciengineers.com

(withdrew)

Steven Houh

Precision Systems, Inc.

steven@dcpsi.com

(withdrew)


Mugdha Tipnis

WSP

mugdha.tipnis@wsp.com

Kittelson& Associates

Adam Vest

avest@kittelson.com


Toole Design

Melany Alliston-Brick 

malliston@tooledesign.com

 

 


Download Here