ALERT! CMIS for DC PLUG Feeder Construction Projects (DCKA-2021-D-0018) has been published. See the below links for more information.
OCP Solicitation Site: http://app.ocp.dc.gov/RUI/information/scf/SolNumRespond.asp
DTAP: https://dtap.ddot.dc.gov/
Tip | ||||
---|---|---|---|---|
| ||||
The purpose of this site is to publicize solicitations for Architect & Engineering ("A/E") Task Orders ("TO") and to communicate other information relevant to those who are participating and/or teaming on the A/E schedule. |
Using This Site
Below is an explanation of the columns and their meaning.
- A/E Category Description: The A/E category from which the requirement is being solicited.
- Project Description: Brief project description.
- TO Fair Opportunity: List of firms selected to compete for the TO and their associated subcontract POC.
Note: Firms 4 and 5 will be used if the Contracting Officerdeemsadditionalfirms are necessary for a given requirement.
- Solicitation Date: Date the RFQ was transmitted.
- Response Due: Initial Due date for qualifications.
Tip | ||||
---|---|---|---|---|
| ||||
The purpose of this site is to publicize solicitations for Architect & Engineering ("A/E") Task Orders ("TO") and to communicate other information relevant to those who are participating and/or teaming on the A/E schedule. |
Response Due
Response Due
Amended
Solicitation PDF
Firm 1
Firm 2
Firm 3
Firm 4
Firm 5
AECOM
Sean M. Rousseau
sean.rousseau@aecom.com
Alta Planning + Design
Carolyn Sullivan
carolynsullivan@altaplanning.com
Lora Byala
lbyala@foursquare.com
David Whyte
david.whyte@kimley-horn.com
Stephen Walter
stephen.c.walter@parsons.com
Hill International, Inc.
Edward Newman
edward.newman@hillintl.com
Jacobs Engineering Group, Inc.
Kenneth Shields
kenneth.shields@jacobs.com
Marsha Kaiser
marsha.kaiser@wsp.com
Rummel Klepper & Kahl, LLP
Scott Crumley
scrumley@rkk.com
Sean Rousseau
sean.rousseau@aecom.com
Sean Rousseau
sean.rousseau@aecom.com
David Whyte
david.whyte@kimley-horn.com
Kahl
scrumley@rkk.com
Lara Hegler
lara.helger@stvinc.com
Cat D-
Construction Engineering and Management Services
Replacing damaged guiderails and impact attenuators
CANCELLED
Avtar Singh
asingh@ces-consultingllc.com
Kenneth C. Shields,
kenneth.shields@jacobs.com
Mary Wiedorfer
mary.wiedorfer@kci.com
Rizwan Siddiqi
rizwan.siddiqi@ebaengineering.com
David Hieber
dhieber@dewberry.com
Download Here
Steven Hawtof
shawtof@GFNET.com
Philip Riggio
philip.riggio@hdrinc.com
Kurt Thompson
kthompson@dewberry.com
Edward Chamberlayne
Echamberlayne@louisberger.com
inmar.badwan@tylin.com
Rehab 16th Street Bridge over Piney Branch
CANCELLED
mpimprikar@sheladia.com
Roland Barnes
rbarnes@thetemplegroup.com
Donald MacLean
donald.maclean@wsp.com
Safe Routes ot School CM Service
CANCELLED
Jason Wits
jason.wits@woodplc.com
Robert Lancaster
robl@breeassociates.com
Avtar Singh
asingh@ces-consultingllc.com
I66/Rock Creek Parkway/K Street Interchange Study CANCELLED
Sarah Thornton
sarahthornton@altaplanning.com
Philip Riggio
philipriggio@hdrinc.com
vdavis@nspiregreen.com
HDR Engineering
Nancy Connor
(Withdrew)Sam Schwartz Consulting
Richard Retting
STV Incorporated
Lara Hegler
Circulator Program Marketing Outreach and Customer Service
CANCELLED
Veronica Davis
PRR, Inc.
Tracee Strum-Gilliam
AECOM
Sean Rousseau
(Withdrew)
AECOM
Sean Rousseau
Whitman, Requardt & Associates
Joe Makar
Volkert Engineering, PC
Ben Lineberry
Kittelson& Associates
Adam Vest
Sabra & Associates, Inc.
Ziad Sabra
(withdrew)
Toole Design
Melany Alliston-Brick
Kimley-Horn and Associates
David Whyte
(added) (withdrew)
A. Morton Thomas, Inc.
Richard Higdon
Johnson, Mirmiran & Thompson, Inc.
Jay Smith
Precision Systems, Inc.
Steven Houh
Vanasse Hangen Brustlin, Inc.
JenMcGovern
WSP
Rolando Amaya
FY18 Traffic Sign Inventory and Upgrade
CANCELLED
AECOM
Sean Rousseau
(withdrew)
Wood PLC (formerly Amec Foster)
Jason Wits
(withdrew)
Applied Research Associates
Jacob Walter
(withdrew)
O'Connell & Lawrence
Carrie Foster
(withdrew)
Precision Systems, Inc.
Steven Houh
steven@dcpsi.com
Cleveland Park Drainage Improvements
Delon Hampton & Associates, Chartered
Mamo Assefa
Stephen Walter
stephen.c.walter@parsons.com
Inmar Badwan
inmar.badwan@tylin.com
J-Dos International
Janice Vieira
vieira@jdosinternational.com
Greenman Pedersen
KelleNeedle
(withdrew)
EBA Engineering
Kevin Kreis
kevin.kreis@ebaengineering.com
Kimley-Horn
David Whyte
david.whyte@kimley-horn.com
Whitman Requardt and Associates
James Guinter
(withdrew)
Stantec
Simon Simon
simon.simon@stantec.com
CH2MHill
Muhammed Khalid
muhammed.khalid@jacobs.com
HDR Engineering
Kim Myers
(withdrew)
Alta Planning+Design
Jennifer Baldwin
jennifer.baldwin@altaplanningUsing This Site
Below is an explanation of the columns and their meaning.
- A/E Category Description: The A/E category from which the requirement is being solicited.
- Project Description: Brief project description.
- TO Fair Opportunity: List of firms selected to compete for the TO and their associated subcontract POC.
Note: Firms 4 and 5 will be used if the Contracting Officer deems additional firms are necessary for a given requirement.
- Solicitation Date: Date the RFQ was transmitted.
- Response Due: Initial Due date for qualifications.
Note: If the response date (as amended) has passed,offerors will no longer be able to change the composition of their team.
- Response Due as Amended: If the TO was amended and the due date for qualifications was changed, the updated date will be input.
- Solicitation PDF: A PDF copy of the RFQ to include the scope of work.
For questions regarding this site, contact Jeralyn.Johnson@dc.gov.
Site Inclusions
Site Exclusions
A/E Schedule Tool Box
FAQ As of 19 November 2017 [PDF]
Crossing the "Acceptable" Chasm [PDF]
Category Award Matrix [PDF]
27 DCMR [PDF]
Procurement Practices Reform Act [PDF]
OCP Solicitation Website [Weblink]
Contract Invoicing Information
Good to Great Series-CM RFQ Market Response Analysis Presentation Nov 2018
Certification of Final Indirect Costs [PDF]
Checklist for Indirect Costs Submission [PDF]
Cost Summary Template [XLS]
DSLBD District Connect 2019_Good to Great Refresh [PDF]
- updated date will be input.
- Solicitation PDF: A PDF copy of the RFQ to include the scope of work.
For questions regarding this site, contact Jeralyn.Johnson@dc.gov.
Site Inclusions
- A/E TOs will be posted once the solicitation has been sent to all offerors.
- If a solicitation is amended to extend the response due date, the new date will be posted in the Response Due as Amended field.
Site Exclusions
- TOs solicited under the Cooperative Purchasing clause will not be posted
- Amendments will not be available for download
- Forecasted TO requirements
- Set asides as permitted by local law or regulation
Once a TO is awarded, it will be moved to the Task Order page on the left.
A/E Schedule Tool Box
FAQ As of 19 November 2017 [PDF]
Crossing the "Acceptable" Chasm [PDF]
Category Award Matrix [PDF]
27 DCMR [PDF]
Procurement Practices Reform Act [PDF]
OCP Solicitation Website [Weblink]
Contract Invoicing Information
Good to Great Series-CM RFQ Market Response Analysis Presentation Nov 2018
Certification of Final Indirect Costs [PDF]
Checklist for Indirect Costs Submission [PDF]
Cost Summary Template [XLS]
DSLBD District Connect 2019_Good to Great Refresh [PDF]
OCP_DDOT Procurement Manual PDF
A/E Category Description | Project Description | Task Order Fair Opportunity (At Least 3) | Solicitation Date | Response Due | Response Due Amended | Solicitation PDF | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Firm 1 | Firm 2 | Firm 3 | Firm 4 | Firm 5 | ||||||||||||||||||||||||||||||||||||||
1 | Cat K - Public Participation & Partnering | District TDM– | AECOM | Alta Planning + Design | Foursquare ITP Lora Byala lbyala@foursquare.com | Kimley-Horn and Associates David Whyte david.whyte@kimley-horn.com | Parsons Stephen Walter stephen.c.walter@parsons.com |
|
| Download Here | ||||||||||||||||||||||||||||||||
2 | Cat U - Program Management | DC Circulator Program | Hill International, Inc. | Jacobs Engineering Group, Inc. | WSP, P.C. | Rummel Klepper & Kahl, LLP | AECOM Services Sean Rousseau sean.rousseau@aecom.com | Download Here | ||||||||||||||||||||||||||||||||||
3 | OPTION YEAR 1 RFQS | |||||||||||||||||||||||||||||||||||||||||
4 | Cat S Transit Consulting | DC Circulator Program Support Services | AECOM Sean Rousseau sean.rousseau@aecom.com | Kimley-Horn and Associates David Whyte david.whyte@kimley-horn.com | Scott Crumley Kahl scrumley@rkk.com | STV Lara Hegler lara.helger@stvinc.com |
| |||||||||||||||||||||||||||||||||||
5 | Cat D- Construction Engineering and Management Services | Replacing damaged guiderails and impact attenuators CANCELLED | CES Consulting Avtar Singh asingh@ces-consultingllc.com | Jacobs Engineering Group Kenneth C. Shields, kenneth.shields@jacobs.com | KCI Associates of DC Mary Wiedorfer mary.wiedorfer@kci.com | EBA Rizwan Siddiqi rizwan.siddiqi@ebaengineering.com | Dewberry David Hieber dhieber@dewberry.com |
|
|
| ||||||||||||||||||||||||||||||||
6 | Cat C Bridge Design | Preliminary and Final Design of New York Ave Bridge over Anacostia | Gannett Flemin Eng. & Architects Steven Hawtof shawtof@GFNET.com | HDR Engineering Philip Riggio philip.riggio@hdrinc.com | Dewberry Kurt Thompson kthompson@dewberry.com | Louis Berger DC LLC Edward Chamberlayne Echamberlayne@louisberger.com | TY Lin inmar.badwan@tylin.com |
|
| |||||||||||||||||||||||||||||||||
7 | Cat D Construction Management Services | Rehab 16th Street Bridge over Piney Branch CANCELLED | Mugdha Pimprikar mpimprikar@sheladia.com | Temple Group Roland Barnes rbarnes@thetemplegroup.com | WSP Donald MacLean donald.maclean@wsp.com | CANCELLED |
|
| ||||||||||||||||||||||||||||||||||
8 | Cat D Construction Management Services | Safe Routes ot School CM Service CANCELLED | formerlyAMEC) Jason Wits jason.wits@woodplc.com | Bree & Associates Robert Lancaster robl@breeassociates.com | CES Consulting Avtar Singh asingh@ces-consultingllc.com |
|
| |||||||||||||||||||||||||||||||||||
9 | Cat I Transportation Planning Studies | I66/Rock Creek Parkway/K Street Interchange Study CANCELLED | ALtaPlanning+Design Sarah Thornton sarahthornton@altaplanning.com | HDR Philip Riggio philipriggio@hdrinc.com | Veronica Davis vdavis@nspiregreen.com |
|
| |||||||||||||||||||||||||||||||||||
10 | Cat F Traffic Engineering (Ops & Safety) | Traffic Safety and Engineering - Systemic Analysis | HDR Engineering Nancy Connor (Withdrew) | Sam Schwartz Consulting Richard Retting | STV Incorporated Lara Hegler |
|
| |||||||||||||||||||||||||||||||||||
11 | Cat K - Public Participation & Partnering | Circulator Program Marketing Outreach and Customer Service CANCELLED | Veronica Davis | PRR, Inc. Tracee Strum-Gilliam | AECOM Sean Rousseau (Withdrew) |
|
| |||||||||||||||||||||||||||||||||||
12 | ||||||||||||||||||||||||||||||||||||||||||
13 | OPTION YEAR 2 RFQS | |||||||||||||||||||||||||||||||||||||||||
14 | Cat R Stormwater Management and Green Infrastructure Design | Cleveland Park Drainage and Watershed Improvements - CANCELLED | AECOM Sean Rousseau | Whitman, Requardt & Associates Joe Makar | Volkert Engineering, PC Ben Lineberry |
|
|
| ||||||||||||||||||||||||||||||||||
15 | Category L – Bicycle and Pedestrian Studies, Planning and Design | Near NW III Livabilty Study | Kittelson& Associates Adam Vest | Sabra & Associates, Inc. Ziad Sabra (withdrew) | Toole Design Melany Alliston-Brick | Kimley-Horn and Associates David Whyte (added) (withdrew) |
|
| Download Here | |||||||||||||||||||||||||||||||||
16 | Cat A Roadway Design | K Street Transitway Final Design | A. Morton Thomas, Inc. Richard Higdon | Johnson, Mirmiran & Thompson, Inc. Jay Smith | Precision Systems, Inc. Steven Houh | Vanasse Hangen Brustlin, Inc. JenMcGovern | WSP Rolando Amaya |
|
|
| ||||||||||||||||||||||||||||||||
17 | Cat N Pavement Management and Infrastructure Data Collection | FY18 Traffic Sign Inventory and Upgrade CANCELLED | AECOM Sean Rousseau (withdrew) | Wood PLC (formerly Amec Foster) Jason Wits (withdrew) | Applied Research Associates Jacob Walter (withdrew) | O'Connell & Lawrence Carrie Foster (withdrew) | Precision Systems, Inc. Steven Houh steven@dcpsi.com |
|
|
| ||||||||||||||||||||||||||||||||
18 | Cat A Roadway Design | Cleveland Park Drainage Improvements | Delon Hampton & Associates, Chartered Mamo Assefa | Parsons Stephen Walter stephen.c.walter@parsons.com | TY Lin Inmar Badwan inmar.badwan@tylin.com |
|
| Download Here | ||||||||||||||||||||||||||||||||||
19 | Cat D Construction Engineering and Management Services | Thermoplastic Pavement Marking Stop Gap | J-Dos International Janice Vieira vieira@jdosinternational.com | Greenman Pedersen KelleNeedle (withdrew) | EBA Engineering Kevin Kreis kevin.kreis@ebaengineering.com |
|
| |||||||||||||||||||||||||||||||||||
20 | Cat H Environmental Engineering Investigation and Studies | New York Avenue Streetscape and Trail | Kimley-Horn David Whyte david.whyte@kimley-horn.com | Whitman Requardt and Associates James Guinter (withdrew) | Stantec Simon Simon simon.simon@stantec.com | CH2MHill Muhammed Khalid muhammed.khalid@jacobs.com | HDR Engineering Kim Myers (withdrew) |
|
|
| ||||||||||||||||||||||||||||||||
21 | Cat A Roadway Design | Alabama Avenue-Martin Luther King Jr, Ave to Bowen Concept/30% Design | Alpha Corporation Elizabeth Blevins Elizabeth.blevins@alphacorporation.com | Volkert Laura Newberry laura.newberry@volkert.com | Sheladia Mugdha Pimprikar |
|
| |||||||||||||||||||||||||||||||||||
22 | Cat A - Roadway Design | Macomb Street NW Reconstruction | HNTB, DC Jon Whitney | KLS Engineering Leverson Boodlal (Withdrew) | Toole Design Melody Melany Alliston-Brick |
|
| 12 Jan
|
| Download Here | Cat A Roadway Design | Alabama Avenue-Martin Luther King Jr, Ave to Bowen Concept/30% Design | Alpha Corporation Elizabeth Blevins Elizabeth.blevins@alphacorporation.com | Volkert Laura Newberry laura.newberry@volkert.com | Sheladia Mugdha Pimprikar |
|
| Cat A - Roadway Design | Design Services for the Tenleytown Multimodal Access Project | Century Engineering, Inc. Ken Stratemeyer | EBA Engineering, Inc. Kevin Kreis kevin.kreis@ebaengineering.com (withdrew) | STV Incorporated Lara E. Hegler |
|
| Download Here | Cat A - Roadway Design | Macomb Street NW Reconstruction | HNTB, DC Jon Whitney | KLS Engineering Leverson Boodlal (Withdrew) | Toole Design Melany Alliston-Brick |
|
| Download Here | Cat I Transportation Planning Studies | MLK Jr.-Good Hope Road (GHR) SE Safety and Connectivity Study | KCI Mary Wiedorfer Mary.wiedorfer@kci.com | Kittelson Bailey Lozner blozner@kittelson.com | |||||
Michael Baker Kenneth Mobley kmobley@mbakerintl.com |
| 09 Mar 23 | Category L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | Alta Planning+Design Jennifer Baldwin jennifer.baldwin@altaplanning.com (withdrew) | Kimley-Horn David Whyte (withdrew) | Kittelson Bailey Lozner (withdrew) | Vanasse Hangen Brustlin, Inc Mark Colgan (added) | Stantec Bimal Patel (added) |
|
| |||||||||||||||||||||||||||||||
24 | Cat R – Stormwater Management and Green Infrastructure Design | Broad Branch Stormwater Retrofit Project | Volkert Engineering, PC Ben Lineberry | A. Morton Thomas and Associates, Inc. Laura Mehiel | RK&K, LLP Scott Crumley |
|
| |||||||||||||||||||||||||||||||||||
25 | Cat C – Bridge Design | Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2 | HDR Engineering Thomas Perry | CH2MHill Muhammed Khalid | Hardesty and Hanover Rodney Jarrett |
|
| |||||||||||||||||||||||||||||||||||
26 | Cat D Construction Management Services | Rehab. 16th Street Bridge over Piney Branch | AECOM Sean Rousseau sean.rousseau@aecom.com | Hill Edward Newman edward.newman@hillintl.com | Bree & Associates Robert Lancaster bree@breeassociates.com |
| 29 Mar Fiber Conduit Inspection and Cleaning | Greenman-Pedersen Kellee Needle (withdrew) | CES Syed Khan srkhan@ces-consultingllc.com | M&J Engineering Robert Carlson rcarlson@mjengineering.com |
|
| ||||||||||||||||||||||||||||||
Cat D Construction Management Services | Cleveland Park Streetscape and Drainage | Belstar, Inc. Ozzie Belcher | J-Dos International Janice Vieira | Prime A/E Group Kumar Buvanendaran | ATCS (Withdrew) Sabra & Associates (Mead&Hunt) (Withdrew) Wood PLC (formerly Amec Foster) (Withdrew) |
|
|
| 27 | Cat A - Roadway Design | Citywide sign structure -upgrade & replacement. Final Design and PS&E package | A. Morton Thomas and Associates, Inc. Laura Mehiel | Gannett Fleming Eng. & Architects Steven Hawtof (withdrew) | AECOM Sean Rousseau (withdrew) | Dewberry Kurt Thompson (added) (withdrew) | Delon Hampton & Associates, Chartered Mamo Assefa (added) |
| Cat D Construction Management Services | Florida Ave Ne 2nd St Ne to 14th Street NE | Somat Engineering Arpan Patel Arpan@somateng.com | Volkert Laura Newberry laura.newberry@volkert.com |
| ||||||||||||||||||||
28 | Cat A - Roadway Design | I -295 Weight Station Upgrade | Century Engineering, Inc. Ken Stratemeyer | Alpha Corporation Elizabeth Blevins Elizabeth.blevins@alphacorporation.com (withdrew) | Sheladia Assocaites, Inc. Mugdha Pimprikar | WSP Rolando Amaya |
|
| Category L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | Alta Planning+Design Jennifer Baldwin jennifer.baldwin@altaplanning.com (withdrew) | Kimley-Horn David Whyte (withdrew) | Kittelson Bailey Lozner (withdrew) | Vanasse Hangen Brustlin, Inc Mark Colgan (added) | Stantec Bimal Patel (added) |
| Cat R – Stormwater Management and Green Infrastructure Design | Broad Branch Stormwater Retrofit Project | Volkert Engineering, PC Ben Lineberry | A. Morton Thomas and Associates, Inc. Laura Mehiel |
| |||||||||||||||||||||
29 | Cat C Bridge Design | Anacostia Metro Pedestrian Bridge | Gannett Fleming StevenHawtof shawtof@GFNET.com | WSP Rolando Amaya rolando.amaya@wsp.com | Michael Baker Kenneth Mobley kmobley@mbakerintl.com |
|
| Download Here | ||||||||||||||||||||||||||||||||||
30 | Category J – Transportation Research and Technology Transfer | Roadmap for Agency-wide approach to Automated Image Processing | Manuch Amir CDM Smith Inc. (withdrew) | Manzur Elahi Daniel Consultants, Inc. (withdrew) | Steven Houh Precision Systems, Inc. (withdrew) | Mugdha Tipnis WSP | Kittelson& Associates Adam Vest Toole Design Melany Alliston-Brick |
|
| Cat C Bridge Design | I 66 and Rock Creek Parkway Ramp Study | RK&K, LLP Scott Crumley | AECOM Sean Rousseau sean.rousseau@aecom.com | Michael Baker International Kenneth Mobley kmobley@mbakerintl.com |
| |||||||||||||||||||||||||||
31 | Cat I Transportation Planning Studies | Positive Truck Route | AECOM Sean Rousseau (withdrew) | Alta Planning+Design Jennifer Baldwin jennifer.baldwin@altaplanning.com (withdrew) | WSP Mugdha Tipnis mugdha.tipnis@wsp.com | HDR Engineering Thomas Perry (added) | VHB Daniel Lovas (added) |
|
|
| Cat D Construction Management Services | Douglas Street Pedestrian Bridge | Wood PLC (formerly Amec Foster) John Mittauer john.mittauer@woodplcAmendment 3 | |||||||||||||||||||||||||||||
32 | Cat I Transportation Planning Studies | Freight Plan Update | Kittelson Asociates Alek Pochowski (withdrew) | Quinn Consulting Beth Quinn equinn@quinn-consulting.com | TY Lin James Gregg james.gregg@tylin.com | HNTB Jon Whitney jwhitney@hntb | Parsons Transportation Group Ronaldo Nicholson (withdrew) | RKK Scott Crumley (addedwithdrew) |
|
| Cat L Bicycle and Pedestrian Structures and Design | Vision Zero Traffic Safety Conceptual Design Support KCI Associates Mary Wiedorfer (added)/withdrew Nelson Nygaard Christopher Forinash Mead Hunt (formerly Sabra) Ziad Sabra ziad.sabra@meadhunt.com | Kittelson & Associates Bailey Lozner blozner@kittelson.com |
| added)/withdrew | Michael Baker Kenneth Mobley (added) Kimley-Horn (added) |
|
|
| Cat C – Bridge Design | Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2 | HDR Engineering Kim Myers | CH2MHill Muhammed Khalid | Hardesty and Hanover Rodney Jarrett |
|
| Cat D Construction Management Services | Fiber Conduit Inspection and Cleaning | Greenman-Pedersen Kellee Needle (withdrew) | CES Syed Khan srkhan@ces-consultingllc.com | M&J Engineering Robert Carlson rcarlson@mjengineering.com |
|
| Cat A - Roadway Design | Citywide sign structure -upgrade & replacement. Final Design and PS&E package | A. Morton Thomas and Associates, Inc. Laura Mehiel | Gannett Fleming Eng. & Architects Steven Hawtof (withdrew) | AECOM Sean Rousseau sean.rousseau@aecom | ||||
33 | Cat N Pavement Management and Infrastructure Data Collection | Mobile Pavement Marking Retroflectivity Measurement and Data Collection | O'Connell & Lawrence Carrie Foster (withdrew) | RAMS Engineering Mesfin Lakew mlakew@rams-engineering.com | Vanasse Hangen Brustlin (VHB) Daniel Lovas (withdrew) | AECOM Sean Rousseau (added)/(withdrew) | Precision Systems, Inc. Steven Houh (added) Applied Research Associates Maxx Leach (added) |
|
|
| ||||||||||||||||||||||||||||||||
34 | Cat A Roadway Design | North Capitol Street Corridor Study | CV, Inc Chinmay Vyas (withdrew) Dewberry Kurt Thompson | kthompson@dewberryKLS Engineering Leverson Boodlal leverson.boodlal@kls-eng.com (added) | Delon Hampton & Associates, Chartered Mamo Assefa (added) | Wallace Montgomery & Assoc. Robert Hudson RHudson@wallacemontgomery.com |
|
| Download Here | |||||||||||||||||||||||||||||||||
35 |