Lot 5 Square
Rummel Klepper and Kahl
3
Johnson Mirmiran & Thompson
Volkert Engineering
Category R – Stormwater Management and Green Infrastructure Design
Preliminary Notification Board
Category of A/E Service | Project Description | Firm Determined MHQ | |||
---|---|---|---|---|---|
Cat D CM Services | 16th Street Bridge over Piney Branch- CANCELLED | WSP | |||
Cat K – Public Participation & Partnering | Circulator Program Marketing, Outreach and Customer Service CANCELLED | NspiregreenLLC | |||
Cat R Stormwater Management and Green Infrastructure Design | Cleveland Park Drainage and Watershed Improvements - CANCELLED | Volkert Engineering, PC | |||
Cat N Pavement Management and Infrastructure Data Collection | Traffic Signal Inventory CANCELLED | PSI | |||
Cat D Construction Management Services | Cleveland Park Streetscape and Drainage | PRIME AE Group | |||
Cat H Environmental Engineering & Investigation Studies | New York Avenue Streetscape and Trail | CH2M Hill | Cat R Stormwater Management and Green Infrastructure Design | Broad Branch Stormwater Retrofit Project | Rummel, Klepper & Kahl, LLP (RK&K) |
Cat C Bridge Design | Anacostia Metro Pedestrian Bridge | WSP | |||
Cat I Transportation Planning Studies | Positive Truck Route Signage | WSP | |||
Cat A Roadway Design | North Capitol Street Corridor | KLS | |||
Cat N Pavement Management and Infrastructure Data Collection | Mobile Pavement Marking and Data Collection | PSI | |||
Cat I Transportation Planning Studies | District Freight Plan Update | Kimley Horn | |||
Cat L Bicycle and Pedestrian Studies, Planning & Design | Suitland Parkway Concept Engineering | VHB | |||
Cat D Construction Management Services | Upgrade and Repairs to Weigh-in-Motion | Parsons Transportation Group | |||
Cat N Pavement Management and Infrastructure Data Collection Services | FY 22 Sidewalk Condition Assessment | O'Connell & Lawrence |
A/E IDIQ Award Statistics (Final)
A/E Awards
A/E Category Description
Project Description
Firms Solicited
was Transmitted
D Construction Management Services | Upgrade and Repairs to Weigh-in-Motion | Parsons Transportation Group |
Cat A Roadway Design | Georgetown Transportation Access and Circulation Study | MeadHunt |
Cat L Bicycle & Pedestrian Studies, Planning & Design | Permanent Curb Extension Study | Kitteslon & Associates |
Cat A - Roadway Design | I-295 Weigh Station | WSP |
A/E IDIQ Award Statistics (Final)
A/E Awards
A/E Category Description | Project Description | Number of Firms Solicited | Date Solicitation was Transmitted | Date TO Award was Made | Successful Offeror Name | Published Award Document | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Cat D Construction Engineering and Management Services | Construction of Fiber Optic Networks along Freeways | 3 | Whitman Requart and Associates | Award Document | |||||||||||
2 | Cat D Construction Engineering and Management Services | Reconstruction of Hill East Water Front Phase 1 | 3 | Alpha Corporation | Award Document | |||||||||||
3 | Cat C Bridge Design | City Wide on call Bridge Design Services | 3 |
| Pennoni Corporation | Award Document | ||||||||||
4 | Cat D Construction Engineering and Management Services | Rehabilitation of Anacostia Freeway Bridges (Nos. 1016 &1017) over South Capitol Street Construction Project RR | 3 |
| CES Consulting, LLC | Award Document | ||||||||||
5 | Cat O Right of WAY | Assistance in Acquisition of Lots 804 and 812 in Square 810 | 3 |
| Rummel Klepper and Kahl | Award Document | ||||||||||
6 | Cat A Roadway Design | Pennsylvania Ave NW Streetscape | 3 |
| Vanasse Hangen Brustlin | Award Document | ||||||||||
7 | Cat O Right of Way | Lot 5 Square 709 Florida Ave Multi Modal Transportation Project Lot 5 Square | 3 |
| Johnson Mirmiran & Thompson | Award Document | ||||||||||
8 | Cat L-Bicycle and Pedestrian Studies | Palisades Trolley and Foundry Feasibility Study and concept Plan project PPP | 3 |
| Kittelson and Associates | Award Document | ||||||||||
9 | Cat E- Traffic Engineering (Streetlight and Traffic Signal Design) | Traffic Signal Design Consultant Tra | 5 |
| Sabra Wang Associates Rummel Klepper and Kahl | |||||||||||
10 | Cat I Transportation Planning Studies | Parkside Access and Circulation Study Par | 3 3 |
| Parsons Transportation Group | Award Document | ||||||||||
11 | Cat F Traffic Engineering (Safety and Operations) | Traffic Signal Systems Analysis | 5 |
|
| Johnson Mirmiran & Thompson Volkert Engineering | ||||||||||
12 | Cat I Transportation Planning Studies | Rock Creek East 1 Livability Study Project | 3 |
| Rummel Klepper Kahl | Award Document | ||||||||||
13 | Cat I Transportation Planning Studies | Rock Creek Far West Livability Study | 3 |
| Nspiregreen LLC | Award Document | ||||||||||
14 | Cat U Program Management | Regional, Multimodal Curbside Asset Management Services RFP Preparation Support | 3 |
|
| AECOM | Award Document | |||||||||
15 | Cat D Construction Management Services | Rehabilitation of East Capitol Street Bridge over Anacostia River | 3 |
|
| Rummel Klepper and Kahl | Award Document | |||||||||
16 | Cat D Construction Management Services | 31st Street Bridge over C&O Canal | 5 |
| Volkert Engineering | Award Document | ||||||||||
17 | Cat A Roadway Design | Design Services for Aspen Street NW project | 3 |
| Precision Systems, Inc. | Award Document | ||||||||||
18 | Cat D Construction Management Services | Installation of CCTV on major arterials in the District | 3 |
| Prime AE Group | Award Document | ||||||||||
19 | Cat P ITS Services | FY 18 ITS on-call support services | 3 |
| M&J Engineering | Award Document | ||||||||||
20 | Cat O Right of Way | Acquisition, appraisal, relocation, environmental assessment and hazmat survey in Lot 10, Lot 84 and Lot 819 | 4 |
| Rummel, Klepper and Kahl | Award Document | ||||||||||
21 | Cat P ITS Services | System Design Upgrade and Repair to Weigh-in-Motion (WIM) | 3 |
| HDR Engineering | Award Document | ||||||||||
22 | Cat D Construction Management Services | Rehabilitation of New Jersey Ave NW from H Street to M Street | 5 |
| Somat Engineering | Award Document | ||||||||||
23 | Cat J Transportation Research and Technology Transfer | Highway Safety Administrative Support | 5 |
| KLS Engineering | Award Document | ||||||||||
24 | Cat C Bridge Design | Open-end Engineering Services for Bridges and Structures | 3 |
| WSP P.C. | Award Document | ||||||||||
25 | Cat N Roadway Pavement Marking Assessment | FY 18 Roadway Pavement Marking Assessment | 5 |
| Applied Research | Award Document | ||||||||||
26 | Cat D Construction Management Services | Maryland Ave from 2nd Street to 14th Street NE | 3 |
| Cube Root Corporation | Award Document | ||||||||||
27 | Cat I Transportation Planning Studies | Capital Bikeshare Development Plan Update | 3 |
| Kittelson & Associates | Award Document | ||||||||||
28 | Cat A Roadway Design | 30-100% Design of Florida Ave from 2nd Street NE to H Street NE and Florida Ave and New York Ave NE Intersection | 3 |
| Johnson Mirmiran & Thompson | Award Document | ||||||||||
29 | Cat D Construction Engineering and Management Services | Construction Management, Inspections and Engineering Services during construction for the DC PLUG Feeder 308 Construction Project | 8 |
| Kumi Construction Management | Award Document | ||||||||||
30 | Cat D Construction Engineering and Management Services | Blair Road/Cedar Street/4th Street NW Intersection Improvement project | 3 |
| Parsons Transportation Group | Award Document | ||||||||||
31 | Cat A Roadway Design | Hydraulic Structures Design Improvements | 3 |
| Wallace Montgomery | Award Document | ||||||||||
32 | Cat D Construction Engineering and Management Services | Streetlight Upgrade of the Metropolitan Branch Trail between FLorida Ave and Franklin Street | 3 |
| EBA Engineering | Award Document | ||||||||||
33 | Cat L Bicycle and Pedestrian Studies, Planning & Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | 3 |
| Vanasse Hangen Brustlin | Award Document | ||||||||||
34 | Cat D Construction Engineering and Management Services | Oregon Avenue NW from Military Road to Western Ave and Western Ave from Oregon to 31st St | 3 |
| AECOM | Award Document | ||||||||||
35 | Cat D Construction Engineering and Management Services | I-395 Sign Structure Improvement | 3 |
| RKK | Award Document | ||||||||||
36 | Cat F Traffic Engineering (Operations and Safety) | Traffic Signal On-Site Support Services | 3 |
| Kimley-Horn | Award Document | ||||||||||
37 | Cat A Roadway Design | S Street Revitalization from 7th Street to Florida Ave | 3 |
| A Morton Thomas | Award Document | ||||||||||
38 | Cat U Program Management | Regional, Multimodal Payment & Data Aggregator/Mobility Wallet Services RFP Preparation Support | 6 |
| AECOM | Award Document | ||||||||||
39 | Cat A Roadway Design | Pennsylvania & Potomac Avenue Intersection Improvements | 3 |
| Brudis & Associates | Award Document | ||||||||||
40 | Cat A Roadway Design | Construction Cost Estimate review | 5 |
| Whitman Requardt and Associates, LLP | Award Document | ||||||||||
41 | Cat A Roadway Design | Chestnut Street Sidewalk Improvement Project | 3 |
| Louis Berger DC LLC | Award Document | ||||||||||
42 | Cat F Traffic Engineering (Ops & Safety) | Connecticut Avenue NW Reversible Lane Safety and Operations Study | 3 |
| A Morton Thomas | Award Document | ||||||||||
43 | Cat D Construction Engineering and Management Services | Parkside Pedestrian Bridge | 3 |
| TY Lin International | Award Document | ||||||||||
44 | Cat A Roadway Design | East Capitol Street Mobility and Safety Plan | 3 |
| AECOM | Award Document | ||||||||||
45 | Cat Q Construction Materials Testing | Construction Materials Testing for City Wide Projects | 2 |
| EBA Engineering | Award Document | ||||||||||
46 | Cat D Construction engineering and Management Services | Rehab. of MLK Jr. Ave | 3 |
| Quinn Consulting | Award Document | ||||||||||
47 | Cat A Roadway Design | 30-100% design of Metropolitan Branch Trail from Fort Totten to Takoma NW | 3 |
| Stantec Consulting Services | Award Document | ||||||||||
48 | Cat I Transportation Planning Studies | Safe Routes to School Planning Assistance | 3 |
| Nelson/Nygaard | Award Document | ||||||||||
49 | Cat C Bridge Design | Rehab of Anacostia Bridges No. 78 and 47 | 3 |
| Pennoni | Award Document | ||||||||||
50 | Cat F – Traffic Engineering (Ops & Safety) | Traffic Safety and Engineering - Systemic Analysis | 3 |
| Sam Schwartz Consulting, LLC | Award Document | ||||||||||
51 | Cat C Bridge Design | Appproach Bridges to 14th Street SW (Bridges Nos. 171-1,171-2,171-3,021,1134 and 1134A-1) Phase 2 | 3 |
| HNTB District of Columbia, P.C. | |||||||||||
52 | Cat S Transit Consulting Technical Services | Bus Priority Plan and Program | 3 |
| HNTB District of Columbia, P.C. | Award Document | ||||||||||
53 | Cat P Intelligent Systems | Network Consolidation Management | 3 |
| Daniel Consultant | Award Document | ||||||||||
54 | Cat I Transportation Planning Studies | Move DC | 3 |
| RKK | Award Document | ||||||||||
55 | Cat D Construction Management Services | Guiderails and Impact Attenuators (9 months) | 3 |
| Sheladia | Award Document | ||||||||||
56 | Cat R Stormwater | 4 Watershed Designs | 3 |
| Arcadis | Award Document | ||||||||||
57 | Cat F – Traffic Engineering (Ops & Safety) | Traffic Operations and Parking Plan | 3 |
| Century Engineering, Inc. | Award Document | ||||||||||
58 | Cat D Cat D Construction engineering and Management Services | Mass Ave. NW Rehabilitation Project from 20th Street to Waterside Drive | 5 |
| HNTB DC | Award Document | ||||||||||
59 | Cat A Roadway Design | Stormwater Design | 3 |
| Sabra and Associates | Award Document | ||||||||||
60 | Cat D – Construction Engineering & Management Services | Inspection Services for the Biennial Culvert Inspection Program | 3 |
| KCI Associates of DC, PC | Award Document | ||||||||||
61 | Cat A Roadway Design | Canal Rockslope Stabilization | 3 |
| Gannett Fleming | Award Documentt | ||||||||||
62 | Category R – Stormwater Management and Green Infrastructure Design | Stormwater Retorfit | 3 |
| Straughan Environmental | Award Document | ||||||||||
63 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | 15th Street Bicycle Safety Improvements Design | 3 |
| Nelson/Nygaard Consulting Associates, Inc. | Award Document | ||||||||||
64 | Cat F -Traffic Engineering (Ops & Safety) | Highway Safety Improvement Program | 3 |
| VHB | Award Document | ||||||||||
65 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Near Northwest III Livability Study | 3 |
| Kittelson & Associates | Award Document | ||||||||||
66 | Cat D – Construction Engineering & Management Services | Rock Creek Trail CM Services | 5 |
| HNTB | Award Document | ||||||||||
67 | Cat D – Construction Engineering & Management Services | 16th Street Bus Lanes | 3 |
| Parsons | Award Document | ||||||||||
68 | Cat D – Construction Engineering & Management Services | Safety and Geometric Improvements of I-295 | 3 |
| STV | Award Document | ||||||||||
69 | Cat J Transportation Research & Technology | Pedestrian and Cyclist Intersection Safety Sandbox | 3 |
| HNTB | Award Document | ||||||||||
70 | Cat P Intelligent Transportation System | ITS General Support | 3 |
| ITERIS | Award Document | ||||||||||
71 | Cat D Construction Engineering and Management Services | Penn Ave SL Upgrade | 3 |
| M&J Engineering | Award Document | ||||||||||
72 | Cat D Construction Engineering and Management Services | C Street Implementation | 3 |
| Jacobs | Award Document | ||||||||||
73 | Cat L – Bicycle and Pedestrian Studies, Planning and Design15th Street Bicycle Safety Improvements | Garfield Park-Canal Park Connector Design | 3 | 28 Jan |
| Nelson/Nygaard Consulting Associates, Inc. | Award Document | 64 | Cat F -Traffic Engineering (Ops & Safety) | Highway Safety Improvement Program | 3 |
| VHB
| RK&K | Award Document | |
6574 | Cat L – Bicycle and Pedestrian Studies, Planning and DesignNear Northwest III Livability StudyA Roadway Design | South Capitol Street Circulator Facility | 3 | 13 Feb |
| Kittelson & AssociatesJacobs | Award Document | |||||||||
6675 | Cat D – Construction Engineering & Management Services | Rock Creek Trail CM Services | 5 |
| HNTBA Roadway Design | Van Ness Corridor Design | 3 |
|
| Wallace Montgomery | Award Document | |||||
6776 | Cat D – Construction Engineering & Management Services | 16th Street Bus Lanes | 3 |
| Parsons A - Roadway Design | K Street Transitway Final Design | 5 |
| Johnson, Mirmiran, & Thompson, Inc. | Award Document | ||||||
6877 | Cat D – Construction Engineering & Management ServicesSafety and Geometric Improvements of I-295 | Florida Ave 9th to Sherman | 3 |
| STVRKK | Award Document | ||||||||||
6978 | Cat J Transportation Research & Technology | Pedestrian and Cyclist Intersection Safety Sandbox | 3 |
| HNTBD Construction Management | Service Sign Installation Backlog | 3 |
| CKI | |||||||
7079 | Cat P Intelligent Transportation SystemITS General SupportI Transportation and Planning Studies | DC Circulator Feasibility | 3 | 19 May | 21 Jan | ITERISWSP | ||||||||||
7180 | Cat D Construction Engineering and Management ServicesPenn Ave SL UpgradeA Roadway Design | Cleveland Park Drainage Improvements | 3 | 07 Aug | 04 Feb | M&J EngineeringParsons | Award Document | |||||||||
7281 | Cat D Construction Engineering and Management ServicesC Street Implementation | Chestnut Sidewalk CM | 3 | 12 Feb |
| JacobsCES Consulting | Award Document | |||||||||
7382 | Cat L – Bicycle and Pedestrian Studies, Planning and DesignGarfield Park-Canal Park Connector DesignD Construction Management | Southern Avenue | 3 | 12 Feb | 22 Mar | RK&KRAMS Engineering | Award Document | |||||||||
7483 | Cat A Roadway DesignSouth Capitol Street Circulator FacilityP Intelligent Transportation Systems | Traffic Center Management Relocation Feasibility | 3 | 10 Nov | 23 Mar | JacobsPSI | Award Document | |||||||||
7584 | Cat A Roadway DesignVan Ness Corridor DesignL – Bicycle and Pedestrian Studies, Planning and Design | Metropolitan Branch Trail | 3 | 28 May | 29 Mar | Wallace MontgomeryFehr and Peers | Award Document | |||||||||
7685 | Cat A - Roadway Design | K Street Transitway Final Design | 5 |
| Johnson, Mirmiran, & Thompson, Inc.D Construction Management Services | Construction Inspection Services for St. Elizabeths East Campus Stage 2 | 3 |
| Dewberry | Award Document | ||||||
7786 | Cat D Construction ManagementFlorida Ave 9th to ShermanC Bridge Design | CW Structures and Bridge Design | 3 | 15 Apr |
| RKKWSP | Award Document | |||||||||
7887 | Cat D Construction Management Service Sign Installation BacklogServices | Drainage and Stormwater Improvements | 3 | 28 Apr |
| CKIAlpha Corporation | Award Document | |||||||||
7988 | Cat I Transportation and Planning StudiesDC Circulator FeasibilityD Construction Management Services | Kenilworth Courts | 3 | 10 May |
| WSPKCI | Award Document | |||||||||
8089 | Cat A Roadway DesignCleveland Park Drainage ImprovementsN Pavement Management and Infrastructure Data Collection Services | FY21 Road Assessment | 3 | Sep 202028 May |
| ParsonsPSI | Award Document | |||||||||
8190 | Cat D Construction ManagementChestnut Sidewalk CMA - Roadway Design | Macomb Street NW Reconstruction | 3 | 05 | 01 Jun | CES ConsultingHNTB | Award Document | |||||||||
8291 | Cat D Construction Management Services | Southern AvenueDouglas Pedestrian Bridge | 3 | 27 2020 | 03 Jun | RAMS EngineeringHNTB | Award Document | |||||||||
8392 | Cat P Intelligent Transportation Systems | Traffic Center Management Relocation Feasibility | 3 |
| PSIL Bicycle and Pedestrian Studies Planning and Design | Vision Zero Safety Conceptual Design Support | 3 |
| Kittelson | Award Document | ||||||
8493 | Cat L – Bicycle and Pedestrian Studies, Planning and Design Metropolitan Branch TrailDesign | Bladensburg Road Multimodal Study and access | 3 | Aug | 14 Jul | Fehr and PeersKLS | ||||||||||
8594 | Cat D Construction Management Services | Construction Inspection Services for St. Elizabeths East Campus Stage 2 | 3 |
| Dewberry | Award Document | ||||||||||
86 | Cat C Bridge Design | CW Structures and Bridge Design | 3 |
| WSP | Award Document | ||||||||||
87 | Cat D Construction Management Services | Drainage and Stormwater Improvements | 3 |
| Alpha Corporation | Award Document | ||||||||||
88I Transportation & Planning Studies | MLK Jr-Good Hope Road SE Safety and Connectivity Study | 3 |
| Kittelson | ||||||||||||
95 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | 3 |
| VHB | Award Document | ||||||||||
96 | Cat C Bridge Design | I-66 Ramp to Whitehurst Frwy and K Street NW Bridge over Whitehurst Freeway Ramp | 3 |
| RKK | Award Document | ||||||||||
97 | Cat D Construction Management ServicesKenilworth Courts | Rehab of 16th Street Bridge over Piney Branch | 3 | 14 Apr | 23 Aug | KCIBree & Associates | Award Document | |||||||||
8998 | Cat N Pavement Management and Infrastructure Data Collection ServicesFY21 Road AssessmentA Roadway Design | Tenleytown Multimodal Access Project | 3 | 02 Sep |
| PSISTV | Award Document | |||||||||
9099 | Cat A - Roadway DesignMacomb Street NW ReconstructionD Construction Management Services | Florida Ave Ne 2nd St Ne to 14th Street NE | 3 | 08 Jan |
| HNTBSomat Engineering | Award Document | |||||||||
91100 | Cat D Construction Management ServicesDouglas Pedestrian BridgeA Roadway Design | Alabama Avenue MLK to Bowen | 3 | 02 Jul | Oct 2021 | HNTBVolkert Engineering | Award Document | |||||||||
92101 | Cat L Bicycle and Pedestrian Studies Planning and Design | Vision Zero Safety Conceptual Design Support | 3 |
| KittelsonC Bridge Design | New York Avenue Bridge over Anacostia Preliminary and Final Design | 3 | TY Lin | Award Document | |||||||
93101 | Cat L – Bicycle and Pedestrian Studies, Planning and Design Bladensburg Road Multimodal Study and accessD Construction Management Services | Hot Thermoplastic Paving Marking | 3 | 07 DecKLSEBA | Award Document | |||||||||||
94102 | Cat I Transportation & Planning Studies | MLK Jr-Good Hope Road SE Safety and Connectivity Study | 3 |
| KittelsonC Bridge Design | Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2 | 3 | HDR | Award Document | |||||||
95103 | Cat L – Bicycle and Pedestrian Studies, Planning and Design | Bicycle and Pedestrian Facilities Design and Traffic Analysis | 3 |
| VHBD Construction Management Services | Fiber Conduit Inspection and Cleaning | 3 |
| CES Consulting | Award Document | ||||||
96 | Cat C Bridge Design | I-66 Ramp to Whitehurst Frwy and K Street NW Bridge over Whitehurst Freeway Ramp | 3 |
| RKK | Award Document | ||||||||||
97 | Cat D Construction Management Services | Rehab of 16th Street Bridge over Piney Branch | 3 |
| Bree & Associates | Award Document | ||||||||||
98 | Cat A Roadway Design | Tenleytown Multimodal Access Project | 3 |
| STV | Award Document | ||||||||||
99 | Cat D Construction Management Services | Florida Ave Ne 2nd St Ne to 14th Street NE | 3 |
| Somat Engineering | Award Document | ||||||||||
100 | Cat A Roadway Design | Alabama Avenue MLK to Bowen | 3 |
| Volkert Engineering | Award Document | ||||||||||
101 | Cat C Bridge Design | New York Avenue Bridge over Anacostia Preliminary and Final Design | 3 | TY Lin | Award Document | |||||||||||
101 | Cat D Construction Management Services | Hot Thermoplastic Paving Marking | 3 | EBA | Award Document | |||||||||||
102 | Cat C Bridge Design | Southwest/southeast Freeway Bridge (Bridge 1103, 1104 and 1109) including all approaching ramps– Phase 2 | 3 | HDR | Award Document | |||||||||||
103 | Cat D Construction Management Services | Fiber Conduit Inspection and Cleaning | 3 |
| CES Consulting | Award Document | ||||||||||
104104 | Cat H Environmental Engineering Investigation | New York Avenue Trail | 3 | CH2M Hill | Award Document | |||||||||||
105 | Cat N Pavement Management and Infrastructure Data Collection | Mobile Pavement Marking and Data Collection | 3 | PSI | Award Document | |||||||||||
107 | Cat I Transportation and Planning Studies | Positive Truck Route Signage | 3 | WSP | Award Document | |||||||||||
108 | Cat A Roadway Design | North Capitol Street Corridor | 3 | KLS | Award Document | |||||||||||
109 | Cat L Bicycle and Pedestrian Studies, Planning & Design | Suitland Parkway Concept Engineering | 3 | VHB | ||||||||||||
110 | Cat C Bridge Design | Anacostia Metro Ped Bridge | 3 | WSP | Award Document | |||||||||||
111 | Cat N Pavement Management and Infrastructure Data Collection | FY 22 Sidewalk Condition Assessment | 3 | O'Connell & Lawrence | Award Document | |||||||||||
112 | Cat A Roadway Design | Stormwater/Hydaulics Stormwater Drainage Design | 3 | Stantec | Award Document | |||||||||||
113 | Cat H Environmental Engineering Investigation and Studie | Arizona Avenue Connection to the Capital Crescent Trail | 3 | Stantec | Award Document |